Build the Infrastructure
Powering Bangladesh’s Mega-Projects
Trusted by Global EPCs
25+ Years of Heavy Civil Execution
1.84M M³
Dredged Material Moved
25+
Years of Civil Execution
1.13M M³
Compacted Earth Delivered
80,000 MT
UAE Aggregates Supplied
Build the Infrastructure
Core Capabilities

Bulk Material Supply & Importation
0.8 FM sand and direct-import UAE aggregates in 0–5mm, 5–10mm, 10–20mm and 40–60mm gradations.

Marine Dredging & Riverway Logistics
Cutter-suction dredging with the Matri Chhaya vessel, slurry pumping and bulkhead stockyard management.

Land Reclamation, Earthworks & Compaction
Site preparation, excavation, backfilling and JCB heavy-roller compaction to engineering density.

Heavy Logistics & Fleet Transport
16 CUM Eicher dump trucks and a 320 MT marine barge for bulk sand, earth and stone haulage.

On-site Heavy Equipment Rental
SANY, XCMG, Caterpillar, Komatsu, LiuGong and JCB fleet operated by experienced crews.

Stockyard & Bulkhead Management
Operations at Purbachal, Airport and Beraid stock yards — bulk sand unloading, staging and dispatch.
Sustainability & HSE
Engineering With Safety & Environmental Discipline
We Follow Best Practices
- Documented HSE Procedures
- On-Time Delivery
- Tier-1 OEM Fleet
- Direct UAE Sourcing
Project Footprint
Active Across Bangladesh’s Largest Sites
From the Purbachal Bulkhead expansion and Hazrat Shahjalal International Airport to the Rooppur Nuclear Power Plant site preparation and our Beraid Stock Yard, Zohan delivers heavy civil, dredging and bulk material supply across Bangladesh’s largest infrastructure projects. Our crews and fleet move with the work — staged, sequenced and self-sufficient on remote sites.
Purbachal
Bulkhead Sand Unloading Point
Rooppur NPP
Land Development & Compaction
Beraid Stock Yard
Sylhet Sand Receiving
Leadership
Built by Engineers. Trusted by Global EPCs.
Abdus Salam Sarkar
CEO & Managing Director
Director — Projects
Projects Division
Director — Operations
Operations Division
Featured Projects
Selected Mega-Project References
Science Lab Building
Long Gate Bridge
Enix Lawyer Building
Deep Sea Bridge
What Our Partners Say
Project References
Samsung C&T — ADC Project Engineer
Samsung C&T Team — Airfield Delivery Centre
Zohan delivered 400,000 cubic metres of land development with 0.8 FM sand to spec, on programme, and integrated cleanly with our airfield crews. Their site execution on the Hazrat Shahjalal expansion set the bar.
Sinohydro — Procurement Lead
Sinohydro Team — Airport Stone Supply
Direct-import UAE aggregates from United Quarries in our required gradations (0–5, 5–10, 10–20, 40–60 mm) and traceable documentation. 40,000 MT delivered without a single rejection.
Roin World S.L. — Site Director, Rooppur NPP
Roin World S.L. — Rooppur Nuclear Power Plant
A 19-month programme of 1.84 million cubic metres of dredging and 1.13 million cubic metres of compaction executed safely and on schedule. Zohan’s joint execution with M. Alam & Company was a model partnership.
Sinohydro — FDE Project, Sylhet
Sinohydro Team — Sylhet Sand Unloading
75,000 cubic metres of bulk sand unloaded, transported and stock-piled at Beraid Yard with no downstream disruption to our concrete supply chain.
Request a Quote
Common Questions
Frequently Asked Questions
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
